Dec 2-4, 2026  •  Morial Convention Center  •  New Orleans, LA

Fresh Out of the Yard: Designing Ferry Resilience for an Essential Louisiana Crossing

Agenda Session

Fresh Out of the Yard: Designing Ferry Resilience for an Essential Louisiana Crossing

Dec 03 2026

1:30 PM - 2:15 PM CST

IWBS - Classroom 2, Room R03

What does it take to protect an essential ferry crossing where a single service interruption can force a detour of more than 100 miles? Louisiana’s two new hybrid-electric ferries, purpose-built for the Cameron crossing of the Calcasieu River Ship Channel, offer a real-world answer. The vessels replace a historically single-vessel operation with a two-ferry strategy on a short, high-frequency route that serves Cameron Parish and the proposed $13 billion Commonwealth LNG export facility. Dependable service on this crossing is a critical part of the region’s transportation and economic infrastructure. 

In this session, partners on the project will explain how service risk was translated into vessel and fleet decisions. The panel will walk through the tradeoffs behind the double-ended configuration, diesel-electric and battery-assisted propulsion, enhanced maneuverability, and two-vessel redundancy, showing how each choice was aligned with the consequences of losing service on this route. Attendees will leave with a practical framework for evaluating resilience investments on other essential ferry routes. 

Attendees will:

  • Learn how to define the operational and community consequences of a ferry service outage
  • Understand how to translate route risk into fleet redundancy and vessel design requirements
  • Evaluate the benefits of propulsion flexibility for a short-cycle, high-frequency operating profile
  • Gain a framework for applying route criticality, outage impact, and future demand to their own ferry system 

Speakers

Elliott Bay Design Group

- Project Manager

Labmar Ferry Service

- General Manager